Charleston
Bluffton

Pool Permits in SC: Common Questions Answered

Building a pool in South Carolina? Here’s what you need to know: skipping permits can lead to fines, insurance issues, or even pool removal. Permits ensure safety, compliance with local codes, and protect your investment. Here’s a quick overview:

  • When Permits Are Needed: Permanent pools (in-ground or above-ground over 42 inches deep) and indoor pools require permits. Temporary pools under 42 inches usually don’t.
  • Documents Required: Site plans, proof of ownership, and project details are needed.
  • Licensed Contractors: Required for electrical, plumbing, or gas work.
  • Permit Costs: Fees vary by location and project value but can range from $50 to over $1,000.

Skipping permits can bring hefty penalties, void insurance, and delay your project. Follow local rules, double-check requirements, and hire licensed professionals to stay on track.

Pool permit plans South Carolina

Pool Permit Requirements in South Carolina

Before diving into your pool project, it’s important to understand South Carolina’s pool permit regulations. Statewide rules are in place, but local municipalities may have additional requirements. Here’s a breakdown of which pools need permits, the paperwork involved, and contractor licensing essentials.

Which Pools Need Permits?

In South Carolina, most permanently installed pools require permits. This includes both in-ground and above-ground pools that are permanently set up. Specifically, permits are needed for:

  • Swimming, wading, immersion, and therapeutic pools that are permanently installed.
  • Pools deeper than 42 inches.
  • Indoor pools, regardless of depth, located in basements, pool houses, or other enclosed structures.

On the other hand, temporary above-ground pools and inflatable pools under 42 inches deep typically don’t require permits. However, it’s always a good idea to check with your local building department to confirm specific rules in your area.

Required Documents for Permit Applications

The documents you’ll need for a pool permit application can vary depending on your municipality or county, but there are a few common requirements across South Carolina:

  • Drawn-to-scale site plans: These should show the pool’s location, dimensions, and proximity to property boundaries and nearby structures.
  • Proof of property ownership: This can include a deed or tax records.
  • Project scope description: A clear outline of the work being planned.

Some localities provide specific forms to streamline the process. For instance, the City of Spartanburg offers a "Swimming Pool Permit Application" form, York County has a "Residential Swimming Pool Permit Application", and Georgetown County provides a detailed "Swimming Pool and Spa Permit Checklist".

Licensed Contractor Requirements

If your pool project involves utility or safety system work, hiring licensed contractors is a must. You’ll need to provide contractor details, including licenses and insurance, for any electrical, plumbing, or gas-related work. Here are a few examples:

  • Electrical work: Must be done by a licensed electrician to ensure proper installation of safety features like GFCI protection.
  • Plumbing work: For pool filtration systems, water features, or gas lines for heaters, licensed plumbers are required.

The South Carolina Department of Environmental Services (SCDES) manages pool regulations under Regulation 61-51, which applies to public swimming pools, including construction and operating permits. For residential pools, Chapter 42 of the South Carolina Residential Code 2015 outlines specific guidelines. Additionally, many localities require contractors to pull permits directly, ensuring that licensed professionals handle the technical aspects of construction and code compliance. Be prepared to submit contractor licenses, liability insurance, and workers’ compensation details as part of the application process.

How to Apply for a Pool Permit

Once you’ve gathered all the necessary documents and contractor details, it’s time to submit your application. Most local planning offices offer multiple submission options, including online portals and in-person services.

Where and How to Submit Your Application

Across South Carolina, cities and counties like Charleston, Anderson County, and Oconee County are increasingly using online systems for permit applications:

  • Charleston: Applications can be submitted in person at the Permit Center, located at 2 George Street, Ground Floor, Charleston, SC 29401. The office is open weekdays from 8:30 a.m. to 5 p.m., excluding holidays. Alternatively, you can use the City’s Customer Self-Service (CSS) portal to submit your application online. The Permit Center suggests completing your application online before visiting in person.
  • Anderson County: This county uses the OpenGov platform for online permits. You’ll need to create an account at https://countyofandersonsc.portal.opengov.com/ to apply for building permits, including electrical, mechanical, and plumbing permits.
  • Oconee County: Oconee relies on the Citizenserve portal for permit applications. The portal, available at https://www.citizenserve.com/Portal/PortalController?Action=showHomePage&ctzPagePrefix=Portal_&installationID=153, handles applications for building permits, zoning, planning, and E-911 addressing.

If your local municipality doesn’t have an online system, visit the building and codes department in person or check their website for submission details. Once your application is submitted, the next step is the review process, where officials evaluate compliance and completeness.

Application Review Process

After submission, applications are reviewed to ensure they meet local zoning, building, and safety codes. For example, in Charleston, any project valued over $1,000 requires a plan review.

Delays often occur due to incomplete applications. Missing documents, unclear site plans, or insufficient contractor details can lead to additional information requests, adding days – or even months – to your timeline. To avoid setbacks, double-check that all required forms and documents are complete and clearly labeled before submission.

The South Carolina Department of Environmental Services (SCDES) advises reaching out early in your planning process to set realistic expectations for your timeline. Staying in close contact with the Building Inspections Division and addressing review comments quickly can help keep your project on track. Once approved, the project moves on to the inspection phase.

Required Inspections and Timelines

Building a pool involves multiple inspections to ensure safety and compliance with local codes. Timelines for these inspections depend on factors like the quality of the application, project complexity, and local requirements. For instance, in Summerville, SC, residential and commercial plan reviews typically take about three weeks, with routine inspections often scheduled for the next business day.

To keep your project moving, schedule inspections promptly at each stage. Many jurisdictions allow inspection requests online or by phone, and quick scheduling can help maintain momentum.

Pool Permit Costs in South Carolina

Planning your pool project starts with understanding the costs tied to permits. These vary depending on where you live, the type of pool, and the overall project value.

Permit Fees and How They’re Calculated

Permit fees in South Carolina are typically based on either the construction value or the square footage of the project. For example, Charleston County uses a tiered system where fees increase as the project value rises. If your project is valued between $2,001 and $50,000, you’ll pay $50 for the first $2,000, plus $4 for every additional $1,000. For projects valued between $50,001 and $100,000, the fee is $242 for the first $50,000, plus $3.75 for every additional $1,000.

The City of Charleston has a similar setup but with different rates. Residential construction valued between $1,001 and $50,000 costs $15 for the first $1,000 and $5 for each additional $1,000. For projects between $50,001 and $100,000, the fee is $260 for the first $50,000, with $4 added per $1,000 after that.

Some counties, like Horry County, calculate fees based on square footage. Residential projects cost $0.50 per square foot, with a $50 minimum fee plus a $25 zoning fee. For commercial projects, the fee is $0.35 per square foot (or $0.50 for R-2 occupancy), with the same minimum fee and zoning add-ons.

For public pools, the South Carolina Department of Environmental Services (SCDES) charges $400 plus $0.50 per square foot of surface area for pool types like "A", "B", "C", "D", and "F." If you’re building a Type "E" pool with water slides, expect to pay $1,000 per flume or water course.

Example: In Charleston, SC, a residential project with a total construction valuation of $185,705 would incur a $718 building permit fee and a $359 plan review fee, bringing the total to $1,117.

Additional Costs to Consider

Beyond the basic permit fees, you’ll need to account for extra costs like plan reviews, re-inspections, and penalties.

Plan review fees are common and usually range from 50% to 75% of the permit fee. For instance, Charleston charges a plan review fee equal to 50% of the building permit fee. Hampton County applies the same percentage for residential projects but increases it to 75% for commercial ones. In Summerville, there’s a $30 administrative fee on top of a plan review fee that’s half the permit cost.

Re-inspection fees come into play if your initial inspection reveals issues that need fixing. Summerville charges $150 for re-inspections after two failed inspections for the same defect. In Hampton County, each additional inspection costs $100, while Fairfield County starts at $50 and doubles the fee with each subsequent re-inspection.

Starting construction without the required permits can lead to hefty penalties. For example, Fairfield County doubles the standard permit fee if you begin work without authorization.

Example: In Summerville, SC, a private pool permit costing $30 would also include a $30 administrative fee and a $15 plan review fee, totaling $75 before inspections. If re-inspections are needed after two failed attempts, a $150 fee would apply.

When and How to Pay Permit Fees

Knowing when and how to pay your fees is essential to avoid delays. Most areas follow a two-step payment process: you pay the plan review fee when submitting your application and the permit fee once it’s approved.

In Horry County, for instance, you’ll pay $0.20 per square foot for the plan review fee when submitting your plans. The building permit fee is due after approval. Charleston requires a non-refundable $40 application fee upfront, which covers processing costs but is separate from other fees.

For public pools, payments should accompany your application, made payable to "SCDES Bureau of Finance". Annual operating fees for public pools are due by February 15th, with penalties for late payments kicking in after March 15th. A 10% fee is added on March 15th, and an additional 25% penalty applies if payment is delayed past April 15th.

In Fort Mill, contractors must present their licenses and pay permit fees in person at Town Hall after plan approval. The permit is issued on the spot.

Most jurisdictions accept cash, checks, or credit cards, though some may charge processing fees for card payments. Double-check payment methods in your area to avoid complications.

Understanding these fee structures and payment processes early on will help you stay on track and avoid surprises during your pool project in South Carolina.

sbb-itb-87baa56

Pool Safety and Compliance Rules

South Carolina prioritizes pool safety through strict regulations covering barriers, electrical standards, and insurance requirements, all aimed at keeping families safe.

Pool Barrier and Fence Rules

South Carolina’s dedication to pool safety is evident, especially when considering its troubling drowning statistics. In 2019, the state ranked ninth in the U.S. for fatal, unintentional drownings. For children aged one to four, drowning remains the leading cause of unintentional injury-related deaths in the state.

"These laws aren’t just red tape, they’re designed to save lives."
– Mike Corkery, Pool Safety

The state has adopted the International Swimming Pool and Spa Code (ISPSC) as a baseline, though local jurisdictions may have additional rules. Pool barriers must be at least 48 inches tall when measured from the side facing away from the pool. Gates must be self-closing and self-latching, with latches placed 54 inches above the ground or, if lower, positioned on the pool side. Barriers must be non-climbable, with gaps small enough to block a 4-inch sphere. If a house wall serves as part of the barrier, doors in that wall must be equipped with alarms or self-closing mechanisms.

Gates are required to swing outward and include self-latching devices. If the latch is below 54 inches, it must be installed on the pool side, at least 3 inches below the gate’s top, with no gaps larger than ½ inch within 18 inches of the latch. Be sure to check with your local jurisdiction for any additional requirements.

Electrical and Mechanical Safety Standards

All electrical work related to pools must comply with NFPA 70 and the International Residential Code. Only licensed professionals are permitted to handle electrical or gas-related tasks.

Electrical components within 5 feet of the pool, such as underwater lighting and equipment for recirculating systems, must be properly grounded to prevent electrical shocks. Bonding metallic components like ladders and handrails is also crucial to minimize voltage hazards.

Ground-fault circuit interrupters (GFCIs) are required for all outlets near the pool, ensuring power is cut instantly if an imbalance is detected. Wiring must be rated for corrosive environments, particularly in areas where pool chemicals are stored.

For public pools, the South Carolina Department of Health and Environmental Control (DHEC) mandates proper lighting for nighttime operation to ensure visibility and safety. Additionally, a licensed electrician must inspect all electrical systems before the pool is cleared for use.

While adhering to safety codes is essential, protecting your pool investment also involves addressing insurance considerations.

Homeowner Insurance Requirements

After ensuring your pool meets structural and electrical safety standards, it’s critical to review your homeowner’s insurance to account for the increased liability risk. Pools are considered "attractive nuisances" by insurers, meaning they can pose heightened risks.

"A pool is considered an ‘attractive nuisance’ by the insurance industry. As enjoyable as it is, it will increase your liability risk so it’s advisable to contact your insurance professional and review your insurance if you’ve got a pool or are planning to install one."
– Department of Insurance, SC

Experts recommend increasing liability coverage to at least $300,000 or $500,000, which typically adds only $20–$50 per year to your premium. For even greater protection, consider an umbrella liability policy offering $1 million in coverage, often available for around $200 annually.

Most insurance companies in South Carolina require a fence at least four feet high with self-latching gates that completely enclose the pool. Additional requirements, such as restrictions on diving boards and slides, may also apply. To maintain coverage, the pool must remain filled with clean water and be used appropriately.

Taking extra precautions, such as installing door alarms, using locked covers, and keeping emergency equipment on hand, can sometimes reduce insurance premiums.

Between 2005 and 2014, the U.S. saw an average of over 3,500 fatal, unintentional drownings annually, with more than 20% of victims under the age of 14. Before starting a pool project, consult your insurance provider to ensure your coverage meets all requirements and protects you from the outset.

Common Permit Problems and Solutions

Even with the best preparation, pool permit applications can sometimes hit unexpected snags. Knowing the common issues and how to address them can save you time and prevent unnecessary stress. By tackling potential challenges head-on, you can keep your pool project on track.

Avoiding Incomplete Applications

One of the top reasons pool permit applications get rejected in South Carolina is incomplete documentation. Permit reviewers rely on complete and accurate submissions to evaluate your project. Missing details can bring the process to a halt.

To avoid this, make sure your plans are thorough and detailed. Include exact dimensions, materials, and construction methods to provide a clear picture of your project. Submit both before-and-after plans that show everything from dimensions to equipment placements. Don’t forget to include property surveys, utility locations, drainage plans, and equipment layouts. Also, double-check that all required signatures are in place, fees are calculated correctly, and supporting documents are attached.

Handling HOA and Zoning Issues

Homeowners’ associations (HOAs) and local zoning rules can sometimes complicate the process, but proactive communication can help you navigate these challenges. Keep in mind that HOA rules cannot override state laws or city ordinances.

Start by reviewing your HOA’s CC&Rs (Covenants, Conditions, and Restrictions), bylaws, and rules to understand what pool designs and setbacks are permitted. Reach out to your HOA board early to address potential conflicts with local or state regulations.

"HOA rules cannot override state law." – HOAM

If your HOA raises objections, attend board meetings, present your case, and keep a record of all communications. If internal discussions don’t resolve the issue, consider mediation or arbitration before escalating to legal action.

For zoning concerns, contact your local planning department early in the process. This will help you understand requirements like setback distances, lot coverage limits, and any special restrictions. For instance, in Greenville in 2021, pool construction required at least 50% of the lot to remain green space and mandated specific saltwater system features.

By addressing these issues early, you can integrate solutions into your overall permit strategy.

Meeting Barrier Requirements from Day 1

Safety barriers are a critical part of pool construction, and addressing them from the beginning can prevent delays down the line. Including detailed barrier plans in your initial application shows that you’re prioritizing compliance from the start.

Make sure your barrier design meets all building codes and safety regulations. Plan its placement carefully, considering existing landscaping, utilities, and property features. Even if your project doesn’t require a permit, it must still comply with adopted building codes.

Collaborating with experienced pool contractors who are familiar with local safety requirements can help you design a barrier system that meets regulations. This not only avoids redesigns but also keeps your project moving forward without unnecessary setbacks.

Conclusion: Your Pool Permit Process in South Carolina

Getting a pool permit in South Carolina requires thoughtful planning and attention to detail. Start by reaching out to SCDES and other relevant agencies early in the process. Filling out the Project Questionnaire and scheduling a pre-application meeting can help clarify requirements, saving you both time and money down the line.

Submitting a complete application is key. Make sure all required documents are in order and match your specific project. Before breaking ground, call SC 8-1-1 to check for underground utilities, and verify that your contractor has a valid South Carolina Contractor’s License. Don’t forget to get necessary approvals from your electric company and homeowner’s association if applicable.

Once your application is in, stay on top of communication. Quickly respond to agency requests, address review comments, and double-check that your project site is zoned correctly and has the required infrastructure. Tackling zoning and community concerns early can help avoid permit appeals and reduce the number of permits you may need by minimizing environmental impacts.

For more complex projects, consider hiring an experienced environmental consultant. Their expertise can help you navigate local regulations and avoid unnecessary delays.

FAQs

What happens if I build a pool in South Carolina without the required permits?

Building a pool in South Carolina without securing the proper permits can result in serious headaches. You could be hit with steep fines, face legal action, or even be forced to modify or remove the pool entirely to comply with local building codes. These setbacks can drive up your expenses and delay your project significantly.

On top of that, skipping permits can lead to liability problems later on, particularly if safety issues or property damage occur. To steer clear of these challenges, make sure to obtain all the necessary permits before breaking ground on your pool.

What steps should I take to make sure my pool project meets South Carolina’s state and local regulations?

To make sure your pool project aligns with South Carolina’s rules, the first step is to secure the required permits from both the state and your local government. In South Carolina, pool construction permits are mandatory and must adhere to specific safety and construction guidelines. Also, double-check that your contractor holds the proper license for pool installation and has a solid understanding of local building codes.

Keep an eye on any updates to state or local regulations. Regularly reviewing the guidelines from South Carolina’s Department of Health and Environmental Control (DHEC) and local building codes can save you from unexpected delays or compliance headaches. Taking these steps will help you kick off your pool construction project on the right foot, ensuring it meets all necessary standards.

What should I do if my pool permit application is delayed or denied due to missing documents?

If your pool permit application hits a snag due to missing documents, the first step is to carefully review the feedback provided by your local permitting office. Pinpoint exactly what’s missing or needs correcting, and gather all the necessary paperwork to complete your application.

If anything seems unclear, don’t hesitate to contact the permitting office directly. They can provide guidance on how to fix the issue. Make sure every form is filled out correctly, legible, and includes any required fees. Once you’ve double-checked everything, resubmit your application and stay proactive by following up regularly to monitor its progress.

By addressing these steps carefully, you can minimize further delays and keep your pool project moving forward.

Related posts

Top

This website uses cookies to enhance your browsing experience and deliver personalised ads. By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyse site usage, and assist in our marketing efforts.

More Information Accept All Cookies